EJOT® Application tool
Specification
-
Applications
- Installation tool for sandwich panels and metal sections
Note
For proper sidelap stitching the use of two tools per sandwich panel is recommended.
Side lap acc. to IFBS installation guidelines 8.01
"[...] For the installation of sandwich panels [...] the specified joint spacing has to be maintained in order to ensure sufficient application pressure of the seal strips. [...] Sandwich panel push-on tools have proven to ensure the application pressure of the seal strips. [...]"
Orderidentifier | Article Number | Unit |
---|---|---|
Application tool for sandwich panels and metal profiles | 9150230008 | 1 |
Specifications
|